Ivago, Gent

IVAGO has equipped his incinerator with an energy recovery system to maximize the conversion of the energy in the flue gases into steam. This steam is used both for production of electricity as for heat supply to UZ (university hospital).

IVAGO also wanted a full independence of the electrical network. Therefore plant was designed to operate in "island". Also the start of the lines was made possible in a island and a diesel group has been placed.

 

Type: AVI of 100 kilotons with two identical lines Net connection: 36 kV overhead line through
Power pack: 4.1 MW steam turbine and generator at 12 kV
Investment: 34 mio €
Energy Medium: steam of 360 ° C / 27 bar Electricity: 3.2 MWe